Sources and next steps
- Power5 migration comparison
- Power11 model overview ... current portfolio model guide
- Power11 migration guide ... current software, HMC, storage, and sizing checks
- Power11 configuration and quote validator
Turn what you know about the current Power5 into a sensible Power11 starting model and a short list of proof the quote still needs.
Answer seven questions about the system doing the work today. You will get a starting model family plus the missing evidence that can still change the answer.
Use measured CPW or rPerf and peak activity. Power5 core count alone does not size Power11.
Record memory used by each active partition and add realistic growth, not a round guess.
Count storage, I/O, tape, network, replication, and batch windows because the processor is only one part of the move.
Size the second system, replication, testing, cutover, and rollback when the business cannot wait through a rebuild.
Power5 and Power11 are separated by more than twenty years of processor, memory, I/O, virtualization, firmware, and operating system changes. A smaller current system may do far more work, but the right feature code still depends on the workload and the software tier attached to it.
Carry the tool result into a quote as a starting point. Then make the seller show the CPW or rPerf basis, software tier, memory, storage, adapters, HMC, migration services, and recovery design line by line.